The Plant Floor

Corrections

Corrections to reference pages on theplantfloor are made promptly and transparently. When an error in a factual claim is identified, the policy is to correct the article rather than delete it. A dated correction note is added to the foot of the relevant page. This note summarises the nature of the correction and the date it was made, preserving a record of the update for all readers.

A substantive correction involves a factual inaccuracy that changes the meaning of the content, such as an incorrect production figure, a wrong model specification, or a misattributed technology. Simple typographical errors, broken links, or minor formatting issues are fixed without a correction note, as they do not alter the factual substance of the information.

Readers can report a potential error by contacting theplantfloor. A useful report includes the full web address of the article in question and a clear quote of the exact claim believed to be incorrect. Providing the source of any contrary information is also helpful. Upon receipt of a well-sourced error report, an initial review is typically conducted and a response provided within five working days.

For reference pages, the world does not stand still. Production figures are revised, model cycles end, and supplier contracts change. When such changes occur, the relevant plant, maker, supplier, or technology page is updated as a matter of routine. These updates reflect new, verified information and are not treated as corrections to previous errors, unless the earlier page was factually wrong at the time of publication.

The expected turnaround for implementing a substantive correction after it has been validated is usually within two working days. The dated note at the foot of the article will then be visible to all subsequent readers. This process ensures the reference information on theplantfloor remains a current and reliable resource for professionals focused on Asian production.